Bureau of technical supervision

Construction in Ukraine continues to rise

The prices for construction-Assembly works (CAW) in Ukraine in January-February of 2016, compared with the same period of 2015 increased by 16%, according to the State statistics service of Ukraine.

According to the report, the price increase for CMP according to the results of the first two months of the year recorded in all areas of construction.

авторский надзор

авторский надзор

According gosstata, most increased prices for construction-Assembly works in construction of pipelines, communication and power lines by 25%, as well as in the field of construction of residential buildings by 19%. The least increase in the cost of construction of complex industrial facilities – 9.7%.

The cost of construction and installation works in February of the current year compared with January increased by 0.1%. According to data from the technical supervision service of existing rates would be frozen.
In the state Statistics service noted that the largest price increase in February was recorded in construction of pipelines, communication and power lines by 2%. In the field of construction of houses prices rose by 0.2%. In the construction of non-residential buildings, complex industrial buildings and other engineering structures prices in February fell slightly compared with January.

According to the state statistics service, data are presented excluding the temporarily occupied territory of the Autonomous Republic of Crimea, Sevastopol and part of the zone of the antiterrorist operation.

We will remind, the prices for construction-Assembly works in Ukraine in 2015 has increased by 27.1% compared with 2014. In January 2016 the price of CAW increased by 18.6% in comparison with January of 2015. At the same time, compared with December 2015 the cost of construction and installation works in January decreased by 0.7%.